Arrow YS47 Manuale delle Istruzioni

Navigare online o scaricare Manuale delle Istruzioni per Sparaneve Arrow YS47. Arrow YS47 Instructions / Assembly Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 24
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
* Size rounded off to the nearest foot
BUILDING DIMENSIONS
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
707731210
Model No. YS47-A 697.68601
Owner's Manual & Assembly Instructions
BR01
Exterior Dimensions Interior Dimensions Door
*Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening
Size Size Width Depth Height Width Depth Height Width Height
4' x 7' 50 1/2" x 80 1/4" 49" 79 3/4" 82" 47 3/4" 77 1/2" 81 1/4" 38 1/2" 60 1/4"
1,2 m x 2,0 m 128,3 cm x 203,8 cm 124,5 cm 202,6 cm 208,3 cm 121,3 cm 196,9 cm 206,4 cm 97,8 cm 153,0 cm
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085
Do not return to dealer, they are not
equipped to handle your requests.
Storage Area: 26 Sq. Ft. 154 Cu. Ft.
2,4 m
2
4,4 m
3
Vedere la pagina 0
1 2 3 4 5 6 ... 23 24

Sommario

Pagina 1 - Model No. YS47-A 697.68601

* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV

Pagina 2 - BEFORE YOU BEGIN

It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil

Pagina 3 - PLAN AHEAD

1167293Foil Tape (1)66462Hasp (1)66684Spring Latch (2)66016Facia Cap(1 Right and 1 Left)66463Swivel Staple (1)66714#6-32x7/16" (11 mm)Flat Hd Bol

Pagina 4 - SAFETY FIRST

Parts List BR1212Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 9796 Ramp 1 2 8977 Side Floor Frame 2

Pagina 5 - CARE & MAINTENANCE

13Assembly by Key No.BR13

Pagina 6 - ACCESSORIES

1 Position hinges on sides of rightand left door panels as shown andfasten with 7/16" (11 mm) flat headbolts outside and #6 hex nuts inside.2 Sli

Pagina 7

●●●●● 9796 Ramp (1)●●●●● 9795 Floor Frame (2)●●●●● 8977 Side Floor Frame (2)● Parts Needed For ●Floor Frame AssemblyStep 2 BR15The floor frame must b

Pagina 8

16Step 3BR16● Parts Needed For ●Corner Posts/Rear Siding●●●●● 9793 Corner Post (2)●●●●● 8075 Rear Siding (1)STEP1 Fasten two corner posts to therear c

Pagina 9 - The Base For Your Building

17Step 4BR17● Parts Needed For ●Corner Posts/Side Siding●●●●● 6481 Gusset (4)●●●●● 9793 Corner Post (2)●●●●● 8074 Side Siding (2)STEP1 Attach a gusset

Pagina 10 - Anchoring

18Step 5BR18● Parts Needed For ●Headers/Frame/Jambs●●●●● 9791 Front Header (1)●●●●● 8070 Side Eave Frame (1)●●●●● 8062 Rear Header (1)●●●●● 9789 Left

Pagina 11 - Hardware

19Step 6BR19● Parts Needed For ●Side/Rear Siding/Studs●●●●● 8074 Side Siding (2)●●●●● 8075 Rear Siding (1)●●●●● 8067 Siding Stud (3)●●●●● 8068 Siding

Pagina 12 - Parts List

2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand

Pagina 13 - Assembly by Key No

20Step 7BR20● Parts Needed For ●Gables/Peak/Roof Frames●●●●● 8061 Left Gable (1)●●●●● 8060 Right Gable (1)●●●●● 8069 Side Peak Frame (1)●●●●● 8066 Roo

Pagina 14 - ● Parts Needed For ●

21Step 8BR21● Parts Needed For ●Side Siding/Foam Tape●●●●● 8074 Side Siding (2)STEPInstalling the siding to the roof isbest done with a step ladder.1

Pagina 15 - Floor Frame Assembly

●●●●● 8073 Top Siding (1)●●●●● 8080 Peak Trim (1)●●●●● 8078 Right Wall Trim (1)●●●●● 8079 Left Wall Trim (1)●●●●● 8076 Right Roof Trim (1)●●●●● 8077 L

Pagina 16 - Corner Posts/Rear Siding

1 Position doors in corners of dooropening as shown and fasten hingeswith 7/16" (11 mm) flat head bolts and#6 hex nuts. Be sure the heads onhing

Pagina 17 - Corner Posts/Side Siding

AnchoringAnchor your building at this time.Floor FrameIf you have purchased a Floor Frame Kit you need to install it at this time.24Anchoring and Floo

Pagina 18 - Headers/Frame/Jambs

3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go

Pagina 19

4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build

Pagina 20 - Gables/Peak/Roof Frames

Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia

Pagina 21 - Side Siding/Foam Tape

ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20,3-30,5 c

Pagina 22

THIS PAGEWA SLEFTBLANKINTENTIONALLY7

Pagina 23 - Door Stop

THIS PAGEWA SLEFTBLANKINTENTIONALLY8

Pagina 24 - YS47-A 697.68601

The Base For Your Building9FRONT(DOOR)FRONT(DOOR)Base BR9Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR FRAME KIT: (Ord

Commenti su questo manuale

Nessun commento